Process screens
Clear overview and equipment screens drawn from your P&ID and layout, with live values where operators expect to see them.
Services SCADA for process & utilities
Supervisory Control and Data Acquisition
Utilities and process equipment keep the plant running, yet they are often watched by one operator walking between panels. Our SCADA brings their pressures, temperatures, levels, energy and solar generation into one screen, raises alarms when something drifts, and lets authorised people adjust the process from wherever they are.
SCADA earns its place when the cost of noticing late is high: lost steam, wasted power, a failed batch or a pollution-board notice.
Each layer answers a different question. SCADA is the layer that watches the process continuously and lets the right person act on it, without walking to the panel.
Designed around your process, built on industrial communication you can maintain, and organised so the right person sees the right alarm.
Clear overview and equipment screens drawn from your P&ID and layout, with live values where operators expect to see them.
High, low and fault alarms with priorities, time stamps and acknowledgement, tuned with your team so they are not ignored.
Every tag recorded over time, so you can see how pressure, temperature or flow behaved before a trip, and export it for reports.
Change setpoints, start or stop equipment and switch duty and standby from the screen, with permission checks and a confirmation step.
Critical alarms can be pushed to supervisors and maintenance by message, so a night-shift problem doesn’t wait for the morning.
Energy meters, solar inverters, flow meters and run hours in the same view, so you can see solar generation against plant consumption and report it reliably.
Touch HMI screens at the panel for operators on the spot, matched to the same tags and alarms as the central screens.
Teltonika industrial routers link PLCs and meters over Modbus and send data over encrypted MQTT, without opening your plant network to the internet.
Every command and setpoint change is recorded with who made it and when.
Control is only added once supervision is proven, and safety logic always stays local.
Start with a site surveyWalk the plant room with your team. List equipment, PLCs, meters and instruments, and agree what must be watched and what may be controlled.
Define every tag, alarm limit and screen, plus who may change what. You review it before anything is built.
Install gateways and communication, bring the screens and alarms live in monitor-only mode, and tune the alarm limits.
Enable remote setpoints and commands one at a time, tested with your operators, with PLC interlocks left fully in charge.
Continuous equipment that the plant depends on, and that nobody can watch all the time.
Machine dashboards count production on discrete machines and feed the MES. SCADA supervises continuous process and utility equipment through live values, alarms and trends, and it can send setpoints and commands back to the PLC.
Remote commands go to the PLC, which still applies every interlock. Commands need the right permission and a confirmation, are recorded in the audit trail, and are refused when the panel is switched to local or manual.
In most cases, yes. Devices that speak Modbus RTU or TCP can be connected through the gateway. The site survey confirms each device and any changes needed in the PLC.
The PLC and local HMI keep running the process as normal. Remote screens show the connection as lost rather than old values, and supervision resumes when the link returns.
Yes. Inverters and solar energy meters that support Modbus can join the same SCADA: generation, inverter status and faults, and generation against what the plant consumes. Where the inverter supports it, export or power limits can be set from the screen, with the same permissions and audit trail.
Yes. Utility status and energy can sit alongside production in the same platform. For example, compare a line’s output with the compressed air it used.
One team for the shopfloor: each service connects to the others when your project needs it.
Let’s look at your process
Tell us which equipment you want to supervise, what controls it today, and whether you need remote control or monitoring first. We’ll suggest a sensible first scope.
The demo is free, at no cost and with no commitment.